Roads
The total length of the roads under the management of Cantt Board is15.475 km, out of which 8.475 km are stone paved /cement concrete roads.. Table below shows the details of the roads existing in cantonment area under the management of Cantt Board Kasauli.
SL. NO. | Road Type | Length |
---|---|---|
1 | B.T.Road | 7.0 |
2 | Stone Paved /Cement Concrete | 8.475 |
Total | 15.475 |
Key Issues And Concerns
- The bituminous carpeted road is required to be widened.
- Cement concrete paths to be converted into paver/chequered tiles.
- Dry stone paved paths/roads to be re-laid.
- Majority of roads don’t have reflectors to ease night driving
Vision
- Developing road side parking areas ,wherever possible.
- High quality bituminous roads.
- Beautification of roads (side pavers)
- Installation of reflectors on all motor able roads to ease night driving.